Project Description
GETS has successfully completed the full rehabilitation of two crude oil storage tanks (Tk 2 & 7) at the company’s Brega facility. The project scope included engineering support, supervision, equipment, labor, and materials required to restore the tanks to a fully operational and serviceable condition.
The tanks were in varying states of disrepair, necessitating different levels of restoration. All work was executed in strict compliance with the company’s standard procedures, specifications, and the latest industry codes and regulations.
The rehabilitation scope encompassed multiple critical tasks, including:
- Structural Replacements
- Tank and Equipment Rehabilitation
- Foundation and Pipeline Work
- Seal and Safety Installations
- Replacement of Tank Instrumentation
- Testing and Inspections
- Corrosion and Structural Repairs
- Concrete and Safety Infrastructure
Through meticulous planning and execution, GETS ensured the project was completed to the highest quality standards, reinforcing our commitment to excellence in the oil and gas sector.